Denison is set to finish a three-year job of checking every fire hydrant the city owns.
The City Council on Monday, Oct. 5, will consider a contract with HydroMax USA to inspect, flow-test, repaint and make small repairs on roughly 1,216 hydrants, at a cost not to exceed $197,433.56.
The item is on the consent agenda for the 6 p.m. meeting at City Hall, 300 W. Main St., meaning it can be approved in a single vote with other routine items unless a council member pulls it for discussion.
Why the city is doing it
The city owns and maintains about 1,879 hydrants, according to a staff report from Fanchon Stearns, assistant director of public works for capital projects and engineering. To keep what the report calls the city's ISO 1 rating, Denison follows the NFPA 291 standard, which calls for every city hydrant to be tested within a five-year span.
Staff recommends handling about a fifth of the inventory each year to keep the work manageable.
HydroMax handled the first two phases in 2025 and 2026, covering about 40% of the system. The first round focused on older parts of the water system, and the second on areas around schools and neighborhoods. This contract covers the remaining 60%, which would put every hydrant in the system inside the required window.





